Pre-cast piling work for the construction of Proposed Mihisaru Resource Management Training Centre at Karadiyana
September 19, 2018
Pre-cast pile driving for the above project is at the final stage. This project consists of supply and driving 103 number of pile point with the 300x300mm, 355x355mm and 400x400mm pile sizes. To the date, 96 number of pile points have completed (about 93%). Our...